毛片免费无码视频-毛片免费在线观看-毛片内射-毛片内射久久久一区-毛片女人毛片一级毛片毛片-毛片女人十八以上观看

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16515

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 精品久久中文字幕有码 | 午夜av观看不卡 | 狠狠亚洲丁香综合久久 | 激情销魂乳妇奶水小说 | 中文字幕日本一区波多野不卡 | 粗大的内捧猛烈 | 精品国产综合成人亚洲区 | 黄网站一区二区三区 | 国产老肥熟xxxx | 无码中文字幕免费一区二区三区 | 国产麻豆一区二区三区在线蜜桃 | 亚洲中文字幕丝袜 | 91久久综合精品久久久综合 | 亚洲男人天堂免费视频 | 精品人妻无码一区二区三区蜜桃一 | 国产老熟女伦老熟妇视频 | 国产精品高清一区二区不卡 | 四虎影视在线看 | 国产三级片网站免费播放 | 精品国精品国产自在久国产应用 | 亚洲国产精品久久 | 国产精品自产拍在线观看涩爱 | 久久精品免视看国产成人 | www国产精品 | 精品久久久久久无码专区 | 国产成人午夜精品一区二区 | 亚洲中文无码人成网 | 果冻传媒91制片潘甜甜七夕年代穿越 | 国产a级精品一级毛片 | 97精品人妻系列无码人妻 | 成人影院m免费 | 亚洲中文字幕在线精品2024 | 国产伦码精品一区二区国产免费av | 亚洲A片V一区二区三区有声 | 亚洲大型综合色网 | 亚洲高清无在码在线看片 | 国产精品自在自线亚洲 | 亚洲精品视频导航 | 久久99精品久久久久久齐齐 | 亚洲一区精品无码 | 中文字幕免费人妻 |